Location:
Chesterfield, VA, USA

Addition of a Flu Gas Desulfurization scrubber system to an existing coal-fired power plant.  System is designed to remove suspended solids, heavy metals, and organics from the scrubber waste stream so water can be safely discharged.  Existing power plant sits on the edge of the James River requiring a large amount of steel to be erected from a barge on the river.

Client:
Dominion Energy
General Contractor:
AMEC
Facts & Figures:
  • Supply 2,800 of tons structural steel
  • Painted, SP6 + 2 coats of high performance paint.
  • Stairs, handrail, decking, and grating.