Location:
Lavonia, GA, USA

A new process for producing conveyor belt material.  Building was an integral part of the process equipment.  Dave Steel Co was chosen for our ability to manage and produce structural steel to ½ the usual industry tolerances.

Client:
Fenner Dunlop
General Contractor:
O’Neal Constructors
Architect:
O’Neal Engineering
Structural Engineer:
O’Neal Engineering
Facts & Figures:
  • Supply and installation of 625 tons structural steel.
  • All steel prime painted.
  • Miscelleneous Stairs and handrail.